Altek Alarko - Kırklareli Combined Cycle Natural Gas Power Plant |
|
Location |
: Kırklareli |
|
Status |
: In operation since December 2010 |
|
Duration |
: 11 months |
|
Client |
: Altek Alarko Power Plant Construction, Operation & Trading Co. Inc. |
|
Scope |
: Supply of 1x20 MWe steam turbine, generator, generator protection & synchronization system; erection & commissioning supervision |
Uğur Energy - Combined Cycle Natural Gas Power Plant |
|
|
Location |
: Çerkezköy, Tekirdağ |
|
Status |
: In operation since September 2010 |
|
Duration |
: 12 months |
|
Client |
: Uğur Enerji Üretim Ticaret ve Sanayi A.Ş. |
|
Scope |
: Supply of 1x12.4 MWe steam turbine & generator; erection & commnissioning supervision |
|
Eti Mine Works - IV. Borax Pentahydrate Plants 160 t/h Steam and10 MWe Power Plant |
|
Location |
: Kırka, Eskişehir |
|
Status |
: In operation since June 2010 |
|
Duration |
: 24 months |
|
Client |
: ÖZTAŞ Construction, Construction Materials Trading Inc. (Main Contractor) |
|
Scope |
: Basic process engineering; supply of 1x160 t/h field erected gas/fuel-oil boiler, 1x10 MWe back pressure steam turbine and generator; erection and commissioning supervision |
Eren Energy - 2x600 MWe Supercritical Pulverized Coal Fired Power Plant |
|
|
Location |
: Çatalağzı, Zonguldak |
|
Status |
: In operation since June 2010 |
|
Duration |
: 36 months |
|
Client |
: CMEC Corp.- China (Main Contractor) |
|
Scope |
: Project development, tecnical & administrative consultancy, local project management & site management support, local material supply, manufacturing & erection of pipe rack, manufacturing & assemby of building panels and roof coating |
|
İÇDAŞ - 2x135 MWe Fluidized Bed Power Plant |
|
Location |
: Biga, Çanakkale |
|
Status |
: In operation since September 2009 |
|
Duration |
: 40 months |
|
Client |
: CMEC Corp.- China (Main Contractor) |
|
Scope |
: Project development, technical & administrative consultancy, local project management & site management support, local material supply |
Eti Soda - 2x10 MWe Fluidized Bed Cogeneration Plant |
|
|
Location |
: Beypazarı, Ankara |
|
Status |
: In operation since March 2009 |
|
Duration |
: 22 months |
|
Client |
: CMEC Corp.- China (Main Conntractor) |
|
Scope |
: Project development, technical & administrative consultancy, local project management & site management support, local material supply |
|
Park Termik - Silopi 135 MWe Fluidized Bed Power Plant |
|
Location |
: Silopi, Şırnak |
|
Status |
: In operation since December 2008 |
|
Duration |
: 36 months |
|
Client |
: CMEC Corp. - China (Main Contractor) |
|
Scope |
: Project development, technical & administrative consultancy, local project management & site management support, local material supply |
OYKA - 10 MWe Back Pressure Steam Turbine Maintenance |
![]() |
|
Location |
: Çaycuma, Zonguldak |
|
Status |
: In operation since March 2008 |
|
Duration |
: 10 days |
|
Client |
: OYKA Kağıt Ambalaj San. Tic. A.Ş. |
|
Scope |
: Modernization of 10 MWe back pressure steam turbine (Siemens) dated 1970 and 20.000 hour overhaul |
![]() |
Alkim - Steam Boiler Control System Revision |
|
Location
|
: Dazkırı, Afyon |
|
Status |
: In operation since August 2008 |
|
Duration |
: - |
|
Client |
: Alkim Alkali Chemicals Inc. |
|
Scope |
: Steam boiler control system DCS software update |
OYKA - 65 t/h F.Oil / Natural Gas Fired Steam Boiler Tubing Works |
![]() |
|
Location |
: Çaycuma, Zonguldak |
|
Status |
: In operation since March 2006 |
|
Duration |
: 3 months |
|
Client |
: OYKA Kağıt Ambalaj San. Tic. A.Ş. |
|
Scope |
: Complete mechanical maintenance and retubing of, fuel-oil fired, 67 atm /500°C / 65 t/h steam boiler (Steinmüller, dated 1970) |
|
İÇDAŞ - 135 MWe Fluidized Bed Autoproducer Plant |
|
Location |
: Biga, Çanakkale |
|
Status |
: In operation since December 2005 |
|
Duration |
: 33 months |
|
Client |
: CMEC Corp. – China (Main Contractor) |
|
Scope |
: Project development, technical and administrative consultancy, combustion test realization, local project management and site management support, local material supply |
OYKA - 10 MWe Back Pressure Steam Turbine Modernization |
|
|
Location |
: Çaycuma, Zonguldak |
|
Status |
: In operation since July 2005 |
|
Duration |
: 4 months |
|
Client |
: OYKA Kağıt Ambalaj San. Tic. A.Ş. |
|
Scope |
: Replacing all necessary parts of 10 MWe back pressure steam turbine (Siemens, dated 1970), improving performance, performing tests, installation supervision, manufacturing of spare parts |
|
OYKA - 10 MWe Back Pressure Steam Turbine Gearbox Manufacture |
|
Location |
: Çaycuma, Zonguldak |
|
Status |
: In operation since September 2005 |
|
Duration |
: 3 months |
|
Client |
: OYKA Kağıt Ambalaj San. Tic. A.Ş. |
|
Scope |
: Manufacturing and erection supervision of two new gears (8000 and 1500 rpm) for 10 MWe back pressure steam turbine (Siemens dated 1970) |
Erdemir - 4. Slab Furnace Hydraulic Piping Works |
|
|
Location |
: Krd. Ereğli, Zonguldak |
|
Status |
: In operation since September 2005 |
|
Duration |
: 5 months |
|
Client |
: MİMAG Cons. & Trade Inc. (Main Contractor) |
|
Scope |
: Supply, erection and flushing up to NAS-6 level of high pressure stainless hydraulic pipes, erection of grease, nitrogen and compressed air lines |